Rates of Service:

SNo Service Unit Charges (RO)
1 Lease of industrial plots Square metre/ per annum 250 Baizas for the first 5 years, thereafter, 500 Baizas.*
2 Electricity KW/hour with bank capacitor 12 Baizas. (August - Mar)
24 Baizas (April – May)
3

Water

Gallon

3 Baizas
4 Gas M3 20.5 Baizas
5 Construction permits

Permit

RO10
6 Construction drawings Plan
RO 1 per page
7 Duplicates of lost construction drawing/permit Plan or Permit Rate of original document
8 Duplicates of lost contract documents

Contract

RO5
9 Construction insurance deposit Permit
RO 300-1500 depend on size of project (refundable)

 *To see the Lease of fees for PEIE - Square miter/ per annum - please press here